Case Study
Port Kembla Coal Terminal
The new coal loading facilities at Port Kembla, presently under construction and to be commissioned in August 1982, are being described. The system consists of unit train and bottom-dump truck unloading, open stockyard, ship loading and extensive conveyor belting.
One of the major criteria in dev…read more