Case Study
Belt Replacement at a Long Distance Pipe Conveyor: Belt Design, Installation and Power Measurement
When the Arch Western Coal Skyline Mine decided to replace the old belt of its long distance BC-8 pipe conveyor, a new belt had to be designed to be suitable to the existing routing. In addition, a special installation procedure had to be developed to minimise downtime during the belt installation a…read more