Case Study
Heavy Duty Conveyor Drives – Industrial Gear Units at “Linthal 2015” Hydroelectric Plant Construction
To stabilize the power grid, Swiss supplier Linth-Limmern AG extends its existing Limmern power plant by a pump storage system. Most of the necessary installation is situated underground, and during construction a huge amount of rock material had to be moved. Read here how that happened.
read more