Re: Removal Of Wood From Platinum Ore
Posted on
26. Sep. 2011 - 10:52
https://forum.bulk-online.com/archiv.../t-12144.html?
Depending on the ore feed size / wood maybe a screen.
Regards,
Lyle ■
Contaminantion In Valued Ore Problems
Posted on
26. Sep. 2011 - 11:10
Good Day all ,
Does any one have any suggestions for the removal of wood from a platinum process flow.
We are experiencing problems with "dirty ore " into the Platinum plant.
Large Ø350 x 250-400 Wood Pillars are being passed through the Feeders and Clogging the Flow. The Plant is currently Stopping the conveyor to manually remove the wood from the system.( Approx 800-900 kg a Day ).
The Conveyor is feed by 10 Vibrating Feeders ( Large Bunker ) , onto a belt conveyor through a tramp Iron Magnet , into the manual picking station , into a hopper which feeds a Jaw Crusher. 1200TPH
Any Suggestions would be Appreciated.
Thanks a Million ,
Jonathan Davies
Does any one have any suggestions for the removal of wood from a platinum process flow.
We are experiencing problems with "dirty ore " into the Platinum plant.
Large Ø350 x 250-400 Wood Pillars are being passed through the Feeders and Clogging the Flow. The Plant is currently Stopping the conveyor to manually remove the wood from the system.( Approx 800-900 kg a Day ).
The Conveyor is feed by 10 Vibrating Feeders ( Large Bunker ) , onto a belt conveyor through a tramp Iron Magnet , into the manual picking station , into a hopper which feeds a Jaw Crusher. 1200TPH
Any Suggestions would be Appreciated.
Thanks a Million ,
Jonathan Davies
Short of installing another picking belt before
the vibrating feeders you do not have many
options.
As a moderator I have to ask you please update
your contact information as unkown unknown
does not help you here on the forum. ■
Scalp Wood Off
Posted on
27. Sep. 2011 - 02:48
IF you are dumping feed into a DUMPING GRID...large steel opgs......the wood could theoretically be stopped or sidetracked there.
can you describe the infeed system please? ■
Best Regards,George BakerRegional Sales Manager - CanadaTELSMITH IncMequon, WI1-519-242-6664 CellE: (work) [email]gbaker@telsmith.com[/email]E: (home) [email] gggman353@gmail.com[/email]website: [url]www.telsmith.com[/url]Manufacturer of portable, modular and stationary mineral processing equipment for the aggregate and mining industries.
Removal of Wood from Platinum Ore
Good Day all ,
Does any one have any suggestions for the removal of wood from a platinum process flow.
We are experiencing problems with "dirty ore " into the Platinum plant.
Large Ø350 x 250-400 Wood Pillars are being passed through the Feeders and Clogging the Flow. The Plant is currently Stopping the conveyor to manually remove the wood from the system.( Approx 800-900 kg a Day ).
The Conveyor is feed by 10 Vibrating Feeders ( Large Bunker ) , onto a belt conveyor through a tramp Iron Magnet , into the manual picking station , into a hopper which feeds a Jaw Crusher. 1200TPH
Any Suggestions would be Appreciated.
Thanks a Million ,