Barge loading terminal at Kalimanthan

Posted in: , on 25. Jun. 2007 - 18:00

We are selecting experianced vendors like-

1. Suppliers for conveying and barge loading equipment.

2. Contractors for jetty civil work.

3. Erection and commissioning agency.

Main writeup for this project--

Coal shall be conveyed from the miner's stockpile which is 900 m from the barge loading point,the conveying system shall be designed in such a way that it can be moved/shifted at other location.

Main inputs--

1. Loading the coal from stockplie to bunkers/ steel silos, located above the ground , by front end loaders and conveying the same at barge loading point @ 1500 tph.

The entire project has to be completed with in 6-7 months. Preferance will be given to turnkey contractors who have already executed similar type of jobs in Kalimanthan area.The meetings can be arranged at Jakarta or in Kalimanthan between July 8 to 13.Self reaching Jakarta on July 8.

Anil

www.libranengineering.com

0091-9811055650