1. Suppliers for conveying and barge loading equipment.
2. Contractors for jetty civil work.
3. Erection and commissioning agency.
Main writeup for this project--
Coal shall be conveyed from the miner's stockpile which is 900 m from the barge loading point,the conveying system shall be designed in such a way that it can be moved/shifted at other location.
Main inputs--
1. Loading the coal from stockplie to bunkers/ steel silos, located above the ground , by front end loaders and conveying the same at barge loading point @ 1500 tph.
The entire project has to be completed with in 6-7 months. Preferance will be given to turnkey contractors who have already executed similar type of jobs in Kalimanthan area.The meetings can be arranged at Jakarta or in Kalimanthan between July 8 to 13.Self reaching Jakarta on July 8.
Barge loading terminal at Kalimanthan
We are selecting experianced vendors like-
1. Suppliers for conveying and barge loading equipment.
2. Contractors for jetty civil work.
3. Erection and commissioning agency.
Main writeup for this project--
Coal shall be conveyed from the miner's stockpile which is 900 m from the barge loading point,the conveying system shall be designed in such a way that it can be moved/shifted at other location.
Main inputs--
1. Loading the coal from stockplie to bunkers/ steel silos, located above the ground , by front end loaders and conveying the same at barge loading point @ 1500 tph.
The entire project has to be completed with in 6-7 months. Preferance will be given to turnkey contractors who have already executed similar type of jobs in Kalimanthan area.The meetings can be arranged at Jakarta or in Kalimanthan between July 8 to 13.Self reaching Jakarta on July 8.
Anil
www.libranengineering.com
0091-9811055650 ■