Re: Pressure On Pavement Under Stockpile
Stockpile Pressure Distribution
Not sure how you would go about for a formula of actual pressure distribution. But I calculate worst case condition as follows:
Assume a column of material 1 foot square at the highest point in your pile x that highest point height from ground x the bulk density of the material in cubic feet will give you a number in PSF or pounds per square foot.
Hope this will help.
Gary Blenkhorn ■
Gary Blenkhorn
President - Bulk Handlng Technology Inc.
Email: garyblenkhorn@gmail.com
Linkedin Profile: http://www.linkedin.com/in/gary-blenkhorn-6286954b
Offering Conveyor Design Services, Conveyor Transfer Design Services and SolidWorks Design Services for equipment layouts.
Re: Pressure On Pavement Under Stockpile
To calculate the worst case is not the problem. I would like to calculate the effect of the "spreading" of forces over a larger area by the product. Like in a silo maximum pressure is at a certain height indepent of filling level. ■
Re: Pressure On Pavement Under Stockpile
Lets see ..
you have a pile and want to predict the stress level in the pavement under the pile .
you will have I guess a conical pile, with some slope angle like 30 degrees. or so , if there are no fines and you pile has no segregation and no consolidation. the stress field can be calculated , from the internal friction angles.
Formulas for bins, can be used or a simple finite element algorithm in excell can be used . the forces will be spread by the friction in the material. now if you can have segregation and consolidation this forces will change significantly, the worst case approach in this case is sound engeneering practice .
You can see the university of Wollongong book on solids flow , I believe one of the authors is Dr, Arnold. it is a good reference.
There are many publications on slope stability and soil mechanics for civil engeneering
or go back to the basics and use Dr Jenike and Johanson ecuations.
Dr zens also incursionated in this field although his results were not intended for floor loading.
Regards
marco ■
Re: Pressure On Pavement Under Stockpile
Pete,
If you have a reclaim tunnel, you must consider: the reclaim tunnel configuration (roof, walls, floor), stockpile floor, stockpile material rheology, and soil elasto-plastic response and the withdrawl configrations to reach a maximum stress.
We have performed FEA and DEM analysis on stockpiles. As others have noted by theory and measurements, the classical equations do not predict the true behavior. This is independent of a tunnel. The classical equations do not have the relaxation properties. Hydraulic pressure head is not correct. In some cases. the stress is bimodal in crossection to the pile and peaks off-center.
Sorry, we don't have a simple equation for it.
Lawrence Nordell
Conveyor Dynamics, Inc.
www.conveyor-dynamics.com ■
Pressure on pavement under stockpile
Can anyone tell me how to calculate the pressure distribution on the pavement under a stockpile? ■