Lime stone loading terminal at Port of Penang-Kuala Prai

Posted in: , on 30. Dec. 2007 - 13:06

We have received an order for the development of Lime stone terminal including preparing of specifications at Kuala Prai-Port of Penang through a boot contractor, where we are designing the entire system which consists of--

1.System designing for Limestone unloading by bottom discharge

wagons.

2. Reclaiming from the pit and conveying to stockpiling.

3. Automatic stacking and reclaiming system.

4. Ship loading system @ 2000 tph.

5. Proposed sizing for approach jetty and main jetty.

Anil Seth

Director

Libran Engineering & Services

www.libranengineering.com

Guest
(not verified)

More Detailed Information

Erstellt am 2. Jan. 2008 - 02:44

Dear Sir

We are a company specilized in bulk handling.For more details pls check our website.

http://www.zltchina.com/english/index.asp

Would you pls offer detailed information about the project?

Any questions pls feel free to contact me directly.

Maize Zhu

HP:0086-1377-688-1318

TEX:0086-519-8325-1902

FAX:0086-519-8325-1908

E-mail:yxb02@zltchina.com

Re: Lime Stone Loading Terminal At Port Of Penang-Kuala Prai

Erstellt am 4. Jun. 2008 - 05:28

mr anil,any news regards to this project?

Guest
(not verified)

Dirt Whacker Belt Cleaners

Erstellt am 24. Jun. 2008 - 10:40

Dear Sir,

We can propose and introduce our Belt Cleaner, winner of the best mining invention called DIRT WHACKER. Please see my web page at www.matam.be The DIRT WHACKER will be the only one giving you good results on quick belts (up to 8 meters/sec), reversible belts and clipped belts. I stay at your entire disposal. Regards.

Gerald Coenen

MATAM S.A.

www.matam.be