Lifting of Wet material (limestone+clay+Schist) Posted in: Forums » Mechanical Feeding & Conveying » Mechanical Conveying , on 31. Dec. 2004 - 13:14 Dear friends,I would be interested to konw if anyone has a equipment for Conveying of wet material as per propotion given below to a vertical hight of about 25 M.The raw meal moisture is as given:Limestone :84 % proportion with 14-16 % moisture with 13.4 % as Average moisture, 0-100 mm particle size.Clay13 % proportion with 22-30 % moisture with 3.9 % as Average moisture, 120 mm particle size, max 5 %Schist:3 % proportion with 28-32 % moisture with 0.9% Average moisture.RegardsAthreyan ■ P R Athreyan Förderung Transport
Lifting of Wet material (limestone+clay+Schist)
Dear friends,
I would be interested to konw if anyone has a equipment for Conveying of wet material as per propotion given below to a vertical hight of about 25 M.
The raw meal moisture is as given:
Limestone :
84 % proportion with 14-16 % moisture with 13.4 % as Average moisture, 0-100 mm particle size.
Clay
13 % proportion with 22-30 % moisture with 3.9 % as Average moisture, 120 mm particle size, max 5 %
Schist:
3 % proportion with 28-32 % moisture with 0.9% Average moisture.
Regards
Athreyan ■