3. May. 2012 - 06:38
On a 3 km long system you probably could even consider using a specialized crane system to do it. How does you concrete beam structure look like and what kind of loads could it take?
The other possibility is naturally to use smaller sub-assemblies that can be more easily handled.
I would need to know a bit more about the case to propose something.
■
Erection of Conveyor Structures Oversea
Dear All
What are the techniques available to erect conveyor structures oversea for a 3kM long conveyor. The conveyor gallery is typical modular units of 24 m each. This modular structure is erected over concrete beams resting on piles until subsea.
Thanks
Harish ■