Posted on 18. Apr. 2008 - 10:03

Please specify your question.

Reinhard Wohlbier

Re: Stock Yard

Posted on 18. Apr. 2008 - 11:13

Originally posted by Author

Please specify your question.

Reinhard Wohlbier

In India most of the power plant store crushed coal in the stock yard. In overseas most of the power plant store uncrushed coal in the stock yard.

Re: Stock Yard

Posted on 18. Apr. 2008 - 04:22

Originally posted by rajesh29rathod

I would like to know the merits & demerits of crushed / uncrushed coal stock for power plant.



Not knowing even if you are connected to power generation is another concern.

Ninety percent of the problem is the method of delivery to the power plant and of course if it is a power plant located at a mines mouth/portal it is a non issue as far a delivery is concerned.

Do you mean run of mine coal coming out of the mine uncrushed below 6 inch size etc; or are you refering to sized soft coal prior to grinding to a 30 mesh size powder blown into a fd/id boiler for use in a steam generating station for electricity?

Re: Stock Yard

Posted on 5. Aug. 2008 - 09:43

Dear sir

It is wery benifical to store the crushed coal for your use which may be help full in many ways, some r handling large lumps will be difficult than crushed ones.

If the coal is having the differences in the calorofic value the coal blending can be possiable.

for any further details you can contact on reddyuna@gmail.com

zenithcrusher
(not verified)

Offer You The Best Answer

Posted on 5. Aug. 2008 - 01:58

Dear sir,

Shanghai Zenith Company is the professional manufacturer in crusher and grinder machine.if you want to know more about the crusher machine,please visit:

×éºÏͼ300

href="http://www.zenithcrusher.com" target="blank">http://www.zenithcrusher.com

Email:

×éºÏͼ300

href="mailto:cassidy886@gmail.com">cassidy886@gmail.com

you will get more from it.

Attachments

×éºÏͼ300 (JPG)

Re: Stock Yard

Posted on 6. Aug. 2008 - 07:12

Some clowns will still argue; but coal, & most bulk solids, must be crushed before stockpiling.

Because: the belt size is determined by the lump size and further because you are really stuffed when you have crusher downtime.

This is core bulk handling!